110 square meters of lawn ready in rolls
PRICE INCLUDING VAT AND TRANSPORT
Composition:
90% Festuca Arundinacea 10% Poa Pratense
N. 2 pallets of 55 square meters, 220 rolls
Real grass rolled lawn obtained from a mixture of 90% of fescue arundinacea and 10% of poa pratense.
It is the most classic English lawn. Evergreen and resistant to trampling and shade.
Placed on the ground it will be sufficient to irrigate it and the lawn will sink its roots into the ground.
Easy take root due to a dense root system. Within a few days it will complete its take root and you will have a thick and dense real grass lawn.
The installation is simple and immediate.
This 110 sqm pallet sales solution is designed for those who want to buy the lawn in rolls quickly and easily.
NB. Delivery takes place on average in 5/6 days from the order and 24 hours from collection, upon notice from our delivery office.
- Festuca arundinacea (%)
- 90
- Poa Pratense (%)
- 10
- Number of clods
- 220
- Thickness of the clod (cm)
- 1.5 - 2
- Clod size (cm)
- 125x40
- Maintenance
- average
- Cold resistance
- medium high
- Resistance to heat
- average
- Trampling resistance
- average
- Resistance to shade
- average
- Resistance to drought
- average
- Salinity resistance
- medium low
- Species
- microtherm
It is necessary to lay the lawn within 24 hours of delivery to guarantee its integrity.
1. Tillage with removal of any residue of old lawn or weeds and large stones (small ones can also be left).
2. Preparation of the installation base by correcting the soil if it is excessively silty or sandy with the addition of silica or river sand or, alternatively, lapillus.
3. Accurate leveling to avoid harmful water stagnation. Keep the ground level 1-2 cm below the level of sidewalks or walkways in general.
4. Fertilization base with phosphorus-based fertilizer to stimulate the root development of the root ball.
5. Laying the lawn: carefully place the clods together, making the edges match (do not overlap). In very large plots, irrigate as you lay it to avoid dehydration of the lawn, especially in the summer season. Do not use small pieces of sod as they are quickly subject to dehydration.
6. Water abundantly as soon as the lawn is laid. Roll the ground to ensure that the carpet can adhere perfectly to the ground, thus eliminating air pockets that would prevent the turf from rooting. In the following days, make sure that the water supply always keeps both the root ball and the underlying soil very moist to help it root. It is advisable to water during the coolest hours of the day: early morning. After approximately 15-20 days after installation, depending on the period, you should no longer be able to lift the clods.
7. Gradually reduce irrigation, trying to accustom the turf to the lowest possible water supply depending on the soil, sun exposure and season.
8. First mowing of the lawn approximately 10 days after installation e always collection of the cut.
9. There are no seasonal limits for the installation of the lawn, but it is good practice, in case of installation at high temperatures, to prevent fungal attacks with specific products and never install in the presence of frozen ground.
10. Fertilizations: at least four basic annual fertilizations are recommended: early spring and late spring with ternary fertilizers with a prevalence of nitrogen content and early autumn and late autumn with ternary fertilizers with a prevalence of potassium content.
11. Fungicide treatment: it is recommended to carry out preventively, especially in the summer season.