CE 08 - Concrete and grass formwork
For parking lots, walkways, escarpments. Three pieces cover 1 m2 of surface.
Delivery Options
| Carrier | Description | Estimated Delivery | |
|---|---|---|---|
![]() | Mail Boxes - 2 giorni | This courier delivers within 48 hours from the moment we entrust the products to him. | Tuesday 6 January - Wednesday 7 January |
![]() | Poste Italiane - 2 giorni Italia | This courier delivers within 24/48 hours from the moment we entrust them with the products. | Tuesday 6 January - Wednesday 7 January |
![]() | DHL - 2 giorni Italia | This courier delivers within 24/48 hours from the moment we entrust the products to him. | Tuesday 6 January - Wednesday 7 January |
![]() | Poste Italiane - 3 giorni punto di ritiro | This courier delivers within 24/72 hours from the moment we entrust them with the products. | Monday 5 January |
![]() | Ritiro in negozio | Choose where to collect your order within 24/48 hours. | Monday 5 January |

Carrier: Mail Boxes - 2 giorni
Description: This courier delivers within 48 hours from the moment we entrust the products to him.
Estimated delivery:
Tuesday 6 January - Wednesday 7 January

Carrier: Poste Italiane - 2 giorni Italia
Description: This courier delivers within 24/48 hours from the moment we entrust them with the products.
Estimated delivery:
Tuesday 6 January - Wednesday 7 January

Carrier: DHL - 2 giorni Italia
Description: This courier delivers within 24/48 hours from the moment we entrust the products to him.
Estimated delivery:
Tuesday 6 January - Wednesday 7 January

Carrier: Poste Italiane - 3 giorni punto di ritiro
Description: This courier delivers within 24/72 hours from the moment we entrust them with the products.
Estimated delivery:
Monday 5 January

Carrier: Ritiro in negozio
Description: Choose where to collect your order within 24/48 hours.
Estimated delivery:
Monday 5 January



The CE 08 cement and grass formwork allows the construction of an external reinforced concrete pavement on site. A monolithic, drive-over and draining slab is obtained.
The voids created in the shaped shapes allow to grass the area where the flooring is made.

The CE 08 formwork modules allow the creation of driveways RESISTANT to differential loads.
They are ECONOMIC, given that the cement and grass formwork CE 08 allows the saving of concrete.
They provide an EFFECTIVE contrast method for swelling the soil.
They create a SELF-DRAINING system, thanks to the passage created by the drainage pockets.
They guarantee a REVIVING effect, because the cement and grass formwork CE 08 provides the possibility of grassing with indigenous plants and species.
They are ECOLOGICAL, being produced with recycled materials.
- Height (cm)
- 60
- Width (cm)
- 60
- Depth (cm)
- 8


