Meadow ELEGANCE Prato Erboso - 1
zoom_out_map
chevron_left chevron_right

Meadow ELEGANCE

The size of the sod is 125 x 40 cm and therefore one sod covers half a square meter of surface.

The quantity ordered is in square meters.

Delivery usually takes place within 5/6 days from ordering and 24/48 hours from collection, subject to notification from our delivery office.

The minimum purchase order quantity for the product is 10.
There are no reviews yet
Close
Make a purchase proposal

Your Offer is sent.

Your Offer is accepted, please check your inbox.

Meadow ELEGANCE
  • Use dot instead of comma

Loading

Telephone support for information before purchasing.
Agronomic consultancy by pre and post sales experts.
We deliver within a week from the order.
Description

Prato ELEGANZA by Prato Erboso Shop is a roll lawn produced with a mixture of perennial ryegrass and poa pratense.

Generally used for sports facilities and where there are no problems with water and excessive heat. It combines a particularly elegant appearance with a decidedly good resistance to trampling. It resists cold very well and heat fairly well. Due to its excellent resistance to trampling, it is the most used species on football fields. Its resistance to shade is less excellent, as it is a lawn that prefers sunny exposures.

It lends itself to fairly low cutting heights between 2.5 and 3.5 cm, but can tolerate heights of up to 1.5 cm for short periods. Cutting can be done with helical or rotary blade mowers.

After purchase, the customer is contacted by our delivery office to arrange the exact day of delivery. The carpet is sodded and shipped the same day to ensure that it arrives fresh to the customer.

The lawn prepared on special pallets is entrusted to contracted couriers equipped with suitable means for fast transport. The unloading from the customer will be carried out by the transporter with means equipped with hydraulic sides or cranes to ensure easy and fast unloading.

Delivery usually takes place within 5/6 days from ordering and 24/48 hours from collection, subject to notification from our delivery office.

The quantity ordered is in square meters, which means that if you write '100' in the Quantity field you will receive 200 rolls of lawn capable of covering a surface of 100 square meters.

Data sheet
Lolium Perenne e Poa Pratense
1631 Items
Perennial ryegrass (%)
70
Poa pratense (%)
30

Buy it with

  • Meadow ELEGANCEx 10
  • Tryko Plus - Microbiotic Fungicide 1 Kg
  • +
  • Bio Start 12-20-15 - 10 Kg Lawn Fertilizer
  • +
  • Sprint N 27-0-14 - 10 kg fertilizer for the lawn
  • Total price: €208.43
Rolled Lawn Installation

It is necessary to lay the lawn within 24 hours of delivery to guarantee its integrity.

1. Tillage with removal of any residue of old lawn or weeds and large stones (small ones can also be left).

2. Preparation of the installation base by correcting the soil if it is excessively silty or sandy with the addition of silica or river sand or, alternatively, lapillus.

3. Accurate leveling to avoid harmful water stagnation. Keep the ground level 1-2 cm below the level of sidewalks or walkways in general.

4. Fertilization base with phosphorus-based fertilizer to stimulate the root development of the root ball.

5. Laying the lawn: carefully place the clods together, making the edges match (do not overlap). In very large plots, irrigate as you lay it to avoid dehydration of the lawn, especially in the summer season. Do not use small pieces of sod as they are quickly subject to dehydration.

6. Water abundantly as soon as the lawn is laid. Roll the ground to ensure that the carpet can adhere perfectly to the ground, thus eliminating air pockets that would prevent the turf from rooting. In the following days, make sure that the water supply always keeps both the root ball and the underlying soil very moist to help it root. It is advisable to water during the coolest hours of the day: early morning. After approximately 15-20 days after installation, depending on the period, you should no longer be able to lift the clods.

7. Gradually reduce irrigation, trying to accustom the turf to the lowest possible water supply depending on the soil, sun exposure and season.

8. First mowing of the lawn approximately 10 days after installation e always collection of the cut.

9. There are no seasonal limits for the installation of the lawn, but it is good practice, in case of installation at high temperatures, to prevent fungal attacks with specific products and never install in the presence of frozen ground.

10. Fertilizations: at least four basic annual fertilizations are recommended: early spring and late spring with ternary fertilizers with a prevalence of nitrogen content and early autumn and late autumn with ternary fertilizers with a prevalence of potassium content.

11. Fungicide treatment: it is recommended to carry out preventively, especially in the summer season.